In master bath room the tile was completed in the shower so we were able to install the trim. That included the main valve body, a diverted handle, rain head and arm, drilled the tile and mounted a bar and connected the hand held shower wond. Assembled the third toilet and and installed it the the hall way powder bath. In kitchen connected the oven/range to the gas supply and test for leaks.