Arrived at customer house Started to perform work proposed Laid down visqueen Started excavation Turned water off to house Removed old main line Excavated further to 20 inches Connected new 3/4 pex mainline to pump house Ran new mainline to entry of the house Connected to brass tee outside of house as well Ran tracer wire around new water line Ran new water line inside of house to mainline shut off Once fully connected turned on water and tested for leaks No leaks present at this time Waited ten minutes Checked for leaks No leaks present at this time Customer currently has full pressure Started to put P-Gravel around water line Checked for leaks No leaks present Started backfilling Checked for leaks once done backfilling No leaks present at this time Insulated piping inside of house Cleaned up work area Thank you for choosing CPI Plumbing and Heating