1900 Railroad Ave
Mt Vernon, WA , WA 98273
360-219-9468

Job Locations
for concrete, wa


Map of Concrete WA
River G.

River G.


Job Checkin

Performed work as proposed. The customer wanted to have an ice maker box installed. I laid down a rug to protect the customer’s floor from damage. We cut out the existing pinhole valve and capped off that part of the line. Performed installation of the new ice maker box. The new ice maker box was installed with a braided stainless steel supply. After the ice maker box was installed I had the customer turn on the water and we tested for leaks with the customer. The ice maker box performed as designed and there were no leaks when last checked. The customer was happy with the new ice maker box. CPI is not responsible for drywall patch and repair. The customer understood They are fully responsible for drywall patch and repair. Thank you for choosing CPI Plumbing and Heating.