1900 Railroad Ave
Mt Vernon, WA , WA 98273
360-219-9468

Job Locations
for coupeville, wa


Map of Coupeville WA
Brannigan B.

Brannigan B.


Job Checkin

Please print paper copy and mail. The original tub was already demoed from its spot in the bathroom. Under the rim of the tub I placed wood backing to level it then underneath the tub mixed and poured thin set concrete mortar mix to support the bottom side because the floor is uneven and partial side of the tub is not sitting on the ground this mortar mix will help support the tub from breaking down in the future from the fiberglass. Redid the waste and overflow to match the new tabs drain and it’s overflow. Connected tabs waste piping and tested for leaks. Pre-drilled fiberglass flange and set screws and leveling the tub. All remaining finished work of tile drywall and flooring will be done by somebody else and is not responsible by Cpi