Checked customer complaint about a leaking main water shut off. Presented customer pricing to replace the shut off valve with a new one. After pricing was approved I cut out the damaged shut off valve. Performed installation of the new shut off valve. After the new shut off valve was installed I turned on the water and tested for leaks with the customer. The new shut off valve performed as designed and there were no leaks when last checked. The customer was happy with the new shut off valve. Thank you for choosing CPI Plumbing and Heating.