1900 Railroad Ave
Mt Vernon, WA , WA 98273
360-219-9468

Job Locations
for la conner, wa


Map of La Conner WA
Coady P.

Coady P.


Job Checkin

Removed old shower curtain rail from upstairs bathroom. Provided and installed new oval shower curtain hanger. Provided and installed new hand held shower wand and 10 inch shower arm. Tested shower head for leaks. This surround is not guaranteed to keep water from leaking outside of tub. It will work better than the system they had, but only a sealed enclosure is a guaranteed to be water tight. CPI plumbing and heating is not responsible for water damage caused by use of this fixture. Customers tenants have ordered new shower curtain and they will install. Gave them instructions on installation. Downstairs bathroom toilet had a broken flush lever. Installed new lever and flapper and adjusted flush.