10/15 Installed washing machine drainline and water supply Installed ice maker supply and valve 10/23 installed sump pump chamber pump check valve and service shutoff with discharge line to outside location electrical to be done by others, connected owners extension (temporary power) Need to return for hydronic heating repair dryer vent rough in has not been done or charged for this will need to be scheduled