PLEASE MAIL INVOICE Arrived onsite to customers home to replace his furnace, removed existing 95% gas furnace. Removed existing base can, installed new basecan, sealed ducting, installed new furnace. Ran new 3/4 pvc condensate drain line. Removed all abs venting, ran new pvc venting from termination to furnace. Connected gas and electrical connections. Created transition from filter housing to furnace. Sealed ducting. Powered on unit tested operation. Supply air temperature is 112 and no co is present in the duct stream. Thank you for choosing CPI Plumbing and Heating Inc.