Jackhammered and dug up water service in greenhouse and repaired leak in line with new 1 1/4 inch black poly water service from leak in line to bowl valve approximately 4 foot section of pipe. Not responsible for re-placement of concrete. Customer is going to let hole dry out and wash line and backfill with better quality dirt.