Installed new lavatory sink, lavatory faucet with pop-up assembly, reworked lavatory drain with new p-trap and installed emergency shutoff valves below sink. Also installed new shower valve and shower trim including shower drain. Tested plumbing once install was finished, no leaks found and all new plumbing is working properly.