In order to install a 50A feed from our main panel to the garage for an EV charger, John had to find a 100-foot path through a maze of pipes, conduits, new & old wires, and concrete walls in our basement. After several attempts, he finally identified some spare conduit spaces for most of the run. On either end the newly installed flex pipe is neat and professional. In addition to the install, John also installed covers on some junction boxes and right-angle turn boxes that had been neglected by an earlier contractor.