most of my fire extinguishers were old, he left replacements and serviced the rest.
The problem, was they had to come out 2 times, due to the phone person did not tell me to measure the window, they just said to take a picture and send it. I understand we all get busy.
I was well informed about everything needed on the property and he finished the job in a timely manner.
. ANNUAL BACKFLOW INSPECTION AND TEST - 1 ( Mechanical Room ) 2. SERVICE CALL
Fire Extinguisher Group - McMinnville Aquatic Center 7 0.50 Fire Extinguisher Annual Maintenance AL Alarm System - SILENT KNIGHT SK5207 2ND FLOOR OFFICE 2.00 Alarm Annual
Alarm System - Unimode 9050UD First Floor Electric Room 3.00 Alarm Annual EXT Fire Extinguisher Group - WASTE MANAGEMENT RENEWABLE 13 1.00 Fire Extinguisher Annual Maintenance
REPLACE FAILED EXIT / EMERGENCY LIGHT BATTERIES
DRY SPRINKLER AIR LEAK TEST - 1 2. REMOVE AND REPLACE RECALLED SPRINKLER HEADS - 2 ( HOOD SYSTEM ) 3. PROVIDE SPRINKLER HEAD FOR SPARE HEAD BOX - 1 4. REPLACE BACKFLOW TEST COCKS - 2 5. REPLACE EXIT / EMERGENCY LIGHT BATTERIES - 4 6. LABOR 7. SERVICE CALL
Fire Extinguisher Annual Maintenance
Dry Sprinkler - Dry Sprinkler 3.50 DRY SPRINKLER INSPECTION BF Backflow Group - McMinnville Senior Center 5 2.00 Backflow Annual Inspection
Emergency/Exit Light Group - McMinnville Senior Center 15 1.75 E-LIGHT INSPECTION AL Alarm System - FCI FC-72 Main Entry Foyer 2.00 FIRE ALARM SERVICE EXT Fire Extinguisher Group - MCMINNVILLE SENIOR CENTER 4 0.25 Fire Extinguisher Annual Maintenance
Alarm System - Silent Knight 5700 First Floor Electric Room 3.00 Annual Fire Alarm Test and Inspection: Audibles to be tested after 6pm EXT 0.75 Fire extinguisher annual maintenance EXT LOANERS NEEDED: (9) 5#ABCs DUE FOR 6 YR
Emergency/Exit Light Group - 9 Repair of Need to schedule a return trip to put E-Light annual inspection stickers. 9 lights total; all passed Spoke with EM - 11/22/22
Conduct 5 year sprinkler requirements 2. Hydro Test FDC 3. Internal Inspection of FDC Check Valve 4. Internal Inspection of Back Flow Device Check Valves 5. Internal Pipe Inspection 6. Replace Sprinkler Gauges 7. Service Call