Repaired broken section of 6” clay pipe in Grosse pointe farms
Installed new 6” pvc from front yard to road in Grosse pointe farms
Cut out cement sidewalk and driveway to access sewer line
Installed new pvc cleanout in front yard in Grosse Pointe farms
replaced the shut-off valve for the toilet supply line. Grosse pointe farms
replaced the toilet with new Mansfield elongated white toilet, new wax seal, Jonny bolts, and supply line. Grosse point farms
Installed new PVB on sprinkler system in Grosse pointe woods
Inspected Pressure Vacuum breaker on sprinkler system in Grosse pointe woods
Estimate to install gas line for dryer. Grosse pointe farms
Estimate to replace hot water tank. Grosse pointe farms
Estimate to replace water heater in Grosse Pointe Farms
Estimate for new gas line in Grosse Pointe
Snaked sewer main in Grosse pointe farms