Performed new sewer connection for residential property in Goldsboro. Project involved connecting home to municipal sewer system following septic system failure. Installation required 85 feet of 4-inch schedule 40 PVC pipe from house to municipal main. Excavated trench to appropriate depth maintaining required 1/4" per foot slope for proper gravitational flow. Encountered unexpected rock formation at approximately 40 feet from structure which necessitated use of pneumatic hammer. Successfully tied into municipal main using appropriate wye fitting as specified by city code. Installed cleanout at property line per regulations. All connections pressure tested and inspected by municipal authorities prior to backfilling. Compacted fill material in 8-inch lifts to prevent future settling. Restored landscaping to pre-excavation condition using sod replacement and mulch application. Provided homeowner with as-built drawings documenting exact pipe routing and depths for future reference. Projec