Our client requested a full inspection of his equipment and complained that his mother had multiple headaches in the home when running heat. Upon inspection I found multiple issues with the existing equipment. And I presented them all to our client. Unit is a 2017 single stage 80% gas furnace Gas line without sediment trap Condensate drain line is without P-trap No slope on secondary drain pan. Pan and unit are directly resting on attic floor No water shutoff safety on primary drain line or secondary drain pan Duct work is not hung properly, it is all resting on top of the attic floor Flue pipe has evidence of spray foam directly on it. This presents an extreme fire safety as spray foam is very flammable. Flue pipe requires minimum 1” clearance all the way around it. At the minimum a heat plate should be placed around the flue pipe at the exit point of the roof to help prevent fires. I shared all my finding with our client as well as ran an air quality report. Due to safety and con