I recently completed a 3-ton attic split installation for a customer in the city. The job involved removing the old furnace and installing a new high-efficiency unit. I also replaced the ductwork and insulated the attic to improve energy efficiency. The customer was very pleased with the results and expressed satisfaction with my work.
I was hired to install a 4-ton package unit in a residential home. The unit was located in the attic and had to be installed on a concrete slab. I started by removing the old unit and disposing of it properly. I then installed the new unit and connected the electrical and refrigerant lines. I also tested the unit to ensure it was working properly. I cleaned up the work area and made sure everything was in order before leaving the job site.
First Company Air Handler Only Installation
Ultimate *Customer requested to reuse old drain line. Stated she spoke to selling tech about it.