I would highly recommend Bay Area.
On time and a great consultation and service! Am definitely switching to this company!
We were very happy with our service professional. Thank you!
Glen was the consummate professional. Very detailed in evaluation the effectiveness and performance of our AC. When he noticed signs of problems, he investigated and fixed them immediately. He left no stone unturned. He is the best we have had from Bay Area.
2.5 ton Rheem HP, dates to 2017 Routine Tune Up Unit top insulation required repair as it was 95% loose
2.5 ton Rheem HP, dates to 2019 Routine Tune Up Presently unit in like new condition Noted low voltage stat wires cracking from dry rot, advised customer and refabed field splice back to good insulation
Found the system low on r410a. Added three lbs and brought the charge to 11 degree Subcooling
Found the system low on r410a. Added three lbs and brought the charge to 11 degree Subcooling
Perform yearly maintenance checks and cleanings. System operating at this time.
Cleaned drain line took off panel to coil cleaned pan out and put dawn dish liquid in drain line. Made sure unit is draining. Also customer wanted silver contract
Cleaned drain line took off panel to coil cleaned pan out and put dawn dish liquid in drain line. Made sure unit is draining. Also customer wanted silver contract
3.5 ton Trane HP, dates to 2010 Temp testing with system on heating and off for cool down shows all areas tested within 2° of each other and from stat = fairly even distribution. Also, Customer has no complaints about cooling temps in summer. Added fiberboard plug to flex duct above vent in garage Noted 12×18 with 10" / 300cfn 18×24 with 14" / 1000cfm Ducting is undersized Existing single UV Bulb appears dated to 2018 Changed filters for customer and sealed area in supply plenum above the AHU
Called customer on phone, customer just needs estimate on doing away with duct in the garage and to check Master run,and quote repairs if needed
Blower motor inoperable. Ordered new motor. Parts warranty. 11/16/21 Replaced blower motor. System operating at this time. Parts warranty
Blower motor comes on when primary power turned on to AH with control wires removed from module New motor required Possible part warranty
Confirmed drain back up & drain float activating Vacumed drain & treated with drain solve Advised customer of routine drain treating with peroxide
Perform yearly maintenance checks and cleanings. System operating at this time. Paid with #145374225