10’ 18’ 10’ 2’ 7’ 3’ 5-RT ends 5-LT ends 1-ic 8/5/19 drained main floor zone and removed all baseboard and elements 9/20/19 installed all new baseboard and elements and connected to existing piping. Filled and purged system. All systems operating properly at this time. Recommend having a cleaning preformed before the heating season begins. Thank you, Brennan and John