This job entailed converting a high-efficiency Viessmann boiler and indirect water heater from oil to natural gas. The process involved removing the old oil tank, installing a new natural gas tank and piping, and installing a new boiler and indirect water heater. The job also required installing new combustion air vents, gas piping, and electrical wiring. Finally, the system was tuned and adjusted to ensure optimal performance.