On this job I looked at both heating and cooling. The heating side all components test in tolerance. The gas furnace has a electro static filter. I cleaned it and washed the condensor. Cooling side test in tolerance as well making a 19° td. The system is ready for heating and cooling
Arrived for a STU All components were working and in tolerance, besides the cap. Relayed Information to customer. Customer okayed for new cap. Recommended flame sensor, dual cap, and compressor saver. Installed cap and system was working before I left.
Arrived for STU Drains clear Installed IAQ1000 Complementary Blower clean Furnace components fine Coil clean Washed condenser coil Capacitors, motors and refrigerant are fine
Replace wire from box to indoor unit and braker and new Canduit to box on outside of home
Cust has to have hour and half notice that mark w and Brian H are headed this way