Tech arrived on site. Performed tune up on an ac unit. Cleaned coils and checked electrical. LRA on compressor was high even with a booster kit. Still under amping. All other amps are good. Unit had good charge and temp split. Replaced contractor because of how pitted it was. Installed blower cap as recommended from last visit. Unit is operational upon departure.