3129 Swetzer Rd. # G
Loomis, CA 95650
916-577-5020

Local Reviews
for cool, ca

Rated 4.5 out of 5 stars based on 8 customer reviews

Best Christmas present ever

Everyone from Crystal Blue were fantastic. All the work was completed in one day AND right before Christmas. Thank you so much. Cathy

  • Overall Experience
  • Quality
  • Price
  • Convenience

Great service nice guy

Very nice, got to the point, knowledgeable

  • Overall Experience
  • Quality
  • Price
  • Convenience

Excellent Service, Great Job!

I was extremely pleased with Sam. He was polite and knowledgeable. A true credit to his Texas roots. He showed me pictures before and after doing the work, explained to me what needed to be fixed and why. Then allowed me to decide what and how much I wanted done,no pressure.

  • Overall Experience
  • Quality
  • Price
  • Convenience

Sam was very helpful and could explain things so I could understand

The job is scheduled for next Friday after that I can give you a better opinion

  • Overall Experience
  • Quality
  • Price
  • Convenience

Great

We had a great experience! Brandon was very knowledgeable and helpful and kind. He is a great example of why we love this company. We're very happy with Crystal Blue Plumbing, Heating & Air!

  • Overall Experience
  • Quality
  • Price
  • Convenience

Bad service/ Disappointed

Technician came out quickly but I never received a promised quote for an HVAV or a split system. He made another appointment but then never showed up. Very disappointed. Bad service.

  • Overall Experience
  • Quality
  • Price
  • Convenience

True journeyman great attitude very professional

Very professional development

  • Overall Experience
  • Quality
  • Price
  • Convenience

Price was high. Service was good.

  • Overall Experience
  • Quality
  • Price
  • Convenience

Job Locations
for cool, ca

Brandon B.

Brandon B. Job Checkin

We will remove old equipment per EPA regulations and install a 3 Ton Trane 15 SEER 2stage gas with single stage cool and variable speed blower. All new R8 ductwork to be installed. Enlarge return duct to 18” all new gas flex, electrical whip, propane kit needed. Nest thermostat included. Install Bradford White propane water heater with expansion tank to be added. New hose lines, included. Permits and testing are in estimate. 1 year club membership include.


Brandon B.

Brandon B. Job Checkin

We will remove old equipment per EPA regulations and install a 3 Ton Trane 15 SEER 2stage gas with single stage cool and variable speed blower. All new R8 ductwork to be installed. Enlarge return duct to 18” all new gas flex, electrical whip, propane kit needed. Nest thermostat included. Install Bradford White propane water heater with expansion tank to be added. New hose lines, included. Permits and testing are in estimate. 1 year club membership include.


Brandon B.

Brandon B. Job Checkin

We will remove old equipment per EPA regulations and install a 3 Ton Trane 15 SEER 2stage gas with single stage cool and variable speed blower. All new R8 ductwork to be installed. Enlarge return duct to 18” all new gas flex, electrical whip, propane kit needed. Nest thermostat included. Install Bradford White propane water heater with expansion tank to be added. New hose lines, included. Permits and testing are in estimate. 1 year club membership include.


Kenneth H.

Kenneth H. Job Checkin

Presite job walk complete


Kenneth H.

Kenneth H. Job Checkin

We will remove old equipment per EPA regulations and install a 3 Ton Trane 15 SEER 2stage gas with single stage cool and variable speed blower. All new R8 ductwork to be installed. Enlarge return duct to 18” all new gas flex, electrical whip, propane kit needed. Nest thermostat included. Install Bradford White propane water heater with expansion tank to be added. New hose lines, included. Permits and testing are in estimate. 1 year club membership include.


Samuel T.

Samuel T. Job Checkin

— Bathroom Lavatory — - Shut water off to house - Cut out emergency water shut offs - Cut out ABS under sink (black piping under sink) - Provide and install new tubular drain discharge fittings under sink - Provide and install two new “EZ Close” water shut offs - Use stainless steel flex hoses to connect water for maximum durability - Test by operating — Bathroom Toilet — - Shut water off to house - Cut out emergency water shut off - Provide and install new “EZ Close” water shut off - Use stainless steel flex house to connect water for maximum durability — Hallway Bathroom — - Cut out and dispose of “tub drain linkage” - Replace with lift and turn style assembly - Test while operating — Basement — - Replace wet insulation with new - Add insulation webbing or straps to hold in place Water hardness test results Less than 1 grain of hardness


Brandon B.

Brandon B. Job Checkin

— Bathroom Lavatory — - Shut water off to house - Cut out emergency water shut offs - Cut out ABS under sink (black piping under sink) - Provide and install new tubular drain discharge fittings under sink - Provide and install two new “EZ Close” water shut offs - Use stainless steel flex hoses to connect water for maximum durability - Test by operating — Bathroom Toilet — - Shut water off to house - Cut out emergency water shut off - Provide and install new “EZ Close” water shut off - Use stainless steel flex house to connect water for maximum durability — Hallway Bathroom — - Cut out and dispose of “tub drain linkage” - Replace with lift and turn style assembly - Test while operating — Basement — - Replace wet insulation with new - Add insulation webbing or straps to hold in place


Brandon B.

Brandon B. Job Checkin

— Bathroom Lavatory — - Shut water off to house - Cut out emergency water shut offs - Cut out ABS under sink (black piping under sink) - Provide and install new tubular drain discharge fittings under sink - Provide and install two new “EZ Close” water shut offs - Use stainless steel flex hoses to connect water for maximum durability - Test by operating — Bathroom Toilet — - Shut water off to house - Cut out emergency water shut off - Provide and install new “EZ Close” water shut off - Use stainless steel flex house to connect water for maximum durability — Hallway Bathroom — - Cut out and dispose of “tub drain linkage” - Replace with lift and turn style assembly - Test while operating — Basement — - Replace wet insulation with new - Add insulation webbing or straps to hold in place


Brandon B.

Brandon B. Job Checkin

— Bathroom Lavatory — - Shut water off to house - Cut out emergency water shut offs - Cut out ABS under sink (black piping under sink) - Provide and install new tubular drain discharge fittings under sink - Provide and install two new “EZ Close” water shut offs - Use stainless steel flex hoses to connect water for maximum durability - Test by operating — Bathroom Toilet — - Shut water off to house - Cut out emergency water shut off - Provide and install new “EZ Close” water shut off - Use stainless steel flex house to connect water for maximum durability — Hallway Bathroom — - Cut out and dispose of “tub drain linkage” - Replace with lift and turn style assembly - Test while operating — Basement — - Replace wet insulation with new - Add insulation webbing or straps to hold in place


Brandon B.

Brandon B. Job Checkin

Customer stated that kitchen sink faucet was leaking into cabinet. Found single handle pricefister faucet to have loose pull out spray head. Tightened, no more leak. Talked with customer about possibly installing new kitchen faucet.


Brandon B.

Brandon B. Job Checkin

Customer stated that kitchen sink faucet was leaking into cabinet. Found single handle pricefister faucet to have loose pull out spray head. Tightened, no more leak. Talked with customer about possibly installing new kitchen faucet.


Brandon B.

Brandon B. Job Checkin

Customer stated that kitchen sink faucet was leaking into cabinet. Found single handle pricefister faucet to have loose pull out spray head. Tightened, no more leak. Talked with customer about possibly installing new kitchen faucet.


Kenneth H.

Kenneth H. Job Checkin

#no. Set for Monday between 9-10 for myself and Mike to go out


Scott P.

Scott P. Job Checkin

Changing swamp cooler belt, installing new customer supplied pads, installing a new water float. And draining and cleaning the swamp cooler pan.


Scott P.

Scott P. Job Checkin

Called client to go over new price with me installing there supplied pads. No answer, mailbox full. New quote has New belt, and new float. And installing there pads x3.