Returned to do plumbing remodel in the hall bathroom at agreed upon pricing. Installed the shower valve without trim, installed the new waste and overflow. The overflow was not long enough so we had to add a tubular extension, doing so made the tub stopper not long enough to plug the drain but the customer was ok and understood the dilemma. Cut into the abs at the lavatory and broke the abs more to the left and stubbed out, customer will attach p-trap and adapter when he installs the vanity. Turned the water on and the tub connections where not leaking, added a piece of 2 by 4 to help support the front of the tub.