Returned to install two new toilets, shower trim, and waste and overflow trim. Determined the shower trim was incorrect, and one toilet flange was broken. Repaired the toilet flange, installed both toilets, turned the water on with no leaks and the toilets are working perfectly. Installed new waste and overflow in the tub after the old piping broke when trying to install the new trim. Tested all the plumbing and everything is working perfectly with no leaks.