Mainline rebuild just outside of home. In this estimate we will need to shut off the power to the well house in order to cut into the piping system. The pipe coming from the well is a 1 inch pipe so we are going to need a 1 inch ball valve Sweat by sweat. Along with a few 1 inch copper 90s, and a new three-quarter inch hose bib at customers request. After reconnecting the pipe and soldering everything together we will then turn the well house back on and do a full system test for any leaks. Our parts and labor and will be warranty for three months.