Installed new evaporator coil. Rebuilt and insulated condensate drain. Added SS-2 and SS-3 float switches. Installed new filter dryer, pressure tested with dry nitrogen and pulled a vacuum on the copper line set. Charged system to factory spec. System is working properly at time of departure.