145 S William St
Newburgh, NY 12550
(845) 562-6722

Local Reviews
for stanfordville, ny

Rated 5.0 out of 5 stars based on 5 customer reviews

Thorough Respectful. Helpful

Went beyond scope of task to answer questions

  • Overall Experience
  • Quality
  • Price
  • Convenience

Excellent in every aspect

Workers were: Thorough-Patient-Neat-Respectful-Hard working-Unobtrusive

  • Overall Experience
  • Quality
  • Price
  • Convenience

Thorough HVAC

  • Overall Experience
  • Quality
  • Price
  • Convenience

Great service

Very thorough evaluation of my system Kevin was determined to correct my problem and willing to answer every question I had and went “all out”. He was knowledgeable, patient, and polite.

  • Overall Experience
  • Quality
  • Price
  • Convenience

Very courteous, knowledgeable tech. Casey reviewed all with us answering any questions we might have.

With the price great and service exceptional would recommend Go Green to friends,


Response from Go Green Express Home Services:

Dear Steve, Thank you for the 5 Star Rating! So happy to read that Casey was courteous and knowledgeable. We appreciate you trusting your home to us and thrilled you would recommend us to your friends. Thank you!

  • Overall Experience
  • Quality
  • Price
  • Convenience

Job Locations
for stanfordville, ny

Luis  C.

Luis C. Job Checkin

Met with Steve and Maryanne. Then we proceeded to shut off power to the unit and the water supply isolation valves. We replaced the system filter along we the Combi boiler igniter. We reconnected the wiring, restored power and opened up the water supply. We asked the homeowners to turn up the thermostat. We observed the boiler fire, run and reach temperature. All is good and operating as it should. Customers were very satisfied with the service.


Luis  C.

Luis C. Job Checkin

<br> Greeted Steve, and proceeded to perform a PTU on a Peerless gas Navien boiler. I replaced the oil tank filter along with the oil pump strainer. I removed the gun assembly, degreased, scrubbed and cleaned. I replaced the nozzle with a 70/75A. Checked and inspected the electrodes, made adjustments. I reassembled the gun assembly, restored power, fired up the boiler, and bled the oil lines. I observed the boiler run, cycle and reach temperature. customer approved to move with the option that the tech recommended. Customer is satisfied with today's PTU.


Brad F.

Brad F. Job Checkin

Arrived at customers house for a plumbing tune-up inspection. Water heater, pipes, well tank seemed to be in good running order. Noticed that well tank is 18 years old and seems to be needing replacement soon, also where water filter was hooked up the valves do not seem to be in good shape. Showed customer estimates and stated she should have the big estimate done soon so she does not experience any leaks. Customer states she will be gone for the holidays but will be back around January. Putting notes and reminder in calendar to call customer back regarding estimates. Customer was very satisfied with work


Miguel  C.

Miguel C. Job Checkin

Arrive to install a new Bosch Inverter 2 Ton R410A. We proceeded to remove all the cables from the condensing unit. Evacuate all the R-410A refrigerant. Remove the Carrier condenser unit. Then we proceeded to install the Bosch Inverter 2 Ton R410A condenser unit. Then we proceeded to remove all the cables and evaporator coils. Then we proceeded to remove the Air handler indoor unit. We proceeded to install the new Bosch Inverter 2 Ton R410A air handler unit. We replace the thermostat. We proceed to do a nitrogen test to ensure that the copper lines do not leak. We proceed to vacuum pump for 1 hour. We open the valves and leave the system ok at this time.


Miguel  C.

Miguel C. Job Checkin

Arrive to install a new Bosch Inverter 2 Ton R410A. We proceeded to remove all the cables from the condensing unit. Evacuate all the R-410A refrigerant. Remove the Carrier condenser unit. Then we proceeded to install the Bosch Inverter 2 Ton R410A condenser unit. Then we proceeded to remove all the cables and evaporator coils. Then we proceeded to remove the Air handler indoor unit. We proceeded to install the new Bosch Inverter 2 Ton R410A air handler unit. We replace the thermostat. We proceed to do a nitrogen test to ensure that the copper lines do not leak. We proceed to vacuum pump for 1 hour. We open the valves and leave the system ok at this time.


Miguel  C.

Miguel C. Job Checkin

Arrive to install a new Bosch Inverter 2 Ton R410A. We proceeded to remove all the cables from the condensing unit. Evacuate all the R-410A refrigerant. Remove the Carrier condenser unit. Then we proceeded to install the Bosch Inverter 2 Ton R410A condenser unit. Then we proceeded to remove all the cables and evaporator coils. Then we proceeded to remove the Air handler indoor unit. We proceeded to install the new Bosch Inverter 2 Ton R410A air handler unit. We replace the thermostat. We proceed to do a nitrogen test to ensure that the copper lines do not leak. We proceed to vacuum pump for 1 hour. We open the valves and leave the system ok at this time.


Miguel  C.

Miguel C. Job Checkin

Arrive to install a new Bosch Inverter 2 Ton R410A. We proceeded to remove all the cables from the condensing unit. Evacuate all the R-410A refrigerant. Remove the Carrier condenser unit. Then we proceeded to install the Bosch Inverter 2 Ton R410A condenser unit. Then we proceeded to remove all the cables and evaporator coils. Then we proceeded to remove the Air handler indoor unit. We proceeded to install the new Bosch Inverter 2 Ton R410A air handler unit. We replace the thermostat. We proceed to do a nitrogen test to ensure that the copper lines do not leak. We proceed to vacuum pump for 1 hour. We open the valves and leave the system ok at this time.


Miguel  C.

Miguel C. Job Checkin

Arrived to re-evaluate estimate performed July 20 of this year, customer signed authorization forms, reviewed job site, confirmed Carrier availability, educated customer of Bosch and Infinity equipment, customer would like two estimates providing detailed estimates of Bosch and Carrier Infinity heat pumps (via email)


Miguel  C.

Miguel C. Job Checkin

Arrived to re-evaluate estimate performed July 20 of this year, customer signed authorization forms, reviewed job site, confirmed Carrier availability, educated customer of Bosch and Infinity equipment, customer would like two estimates providing detailed estimates of Bosch and Carrier Infinity heat pumps (via email)


Miguel  C.

Miguel C. Job Checkin

Arrived to re-evaluate estimate performed July 20 of this year, customer signed authorization forms, reviewed job site, confirmed Carrier availability, educated customer of Bosch and Infinity equipment, customer would like two estimates providing detailed estimates of Bosch and Carrier Infinity heat pumps (via email)


Miguel  C.

Miguel C. Job Checkin

Arrived to re-evaluate estimate performed July 20 of this year, customer signed authorization forms, reviewed job site, confirmed Carrier availability, educated customer of Bosch and Infinity equipment, customer would like two estimates providing detailed estimates of Bosch and Carrier Infinity heat pumps (via email)


Kevin A.

Kevin A. Job Checkin

Arrive at the customer's house to make a service call. I proceeded to offer the SPP plan. The customer approved the HVAC SPP and SSP Plumbing. The customer approved the Diagnostic fee because his unit was not working. CUSTOMER APPROVED * Trip Fee and diagnostic * SSP PLUMBING * SSP HVAC * Replace Turbo 200 multi-fit capacitor * Diagnostic and major ————————————————————————————— Recommended REPLACE OUTDOOR UNITS. THE COMPRESSOR HAS TROUBLESHOOTING PLS FOLLOW UP THIS CUSTOMER ————————— The customer approved a new system Carrier Greenspeed Multi-Stage 3 Ton Puron $22741.76


Casey M.

Casey M. Job Checkin

Arrived to perform Ac tune up. Customer has no concerns Set thermostat call for cooling Observe indoor unit, air filter, electrical connection, condensate system, coils and temperature readings Observe out door unit, service coils, electrical whip, motors, refrigerate lines Ac system operating ok at this time


Casey M.

Casey M. Job Checkin

water treatment estimate


Casey M.

Casey M. Job Checkin

gwpmi