Remove and properly dispose of existing split system. Provide and install one 3.5 ton Rheem gas split system. Installation includes equipment, materials, labor, permit, required testing, and taxes. Also need to redesign ductwork for a 3.5 ton system. Currently it’s ran for only a 2.5 ton system.