Performed CMA inspection on one gas package unit. System is cooling properly, no heat due to an empty L.P. Gas tank. System does spark but no ignition. Amp draws are within specs. Inspection is pre-authorize per Jeff.
Tech inspected 3 gas package systems, cooling operated properly. heat operation was not successful due to having an empty L.P. Gas tank. All 3 Systems spark but no ignition. LP tank needs to be refilled. Amp draws within specs. Pre-authorized per Jeff.