P.O. # 1184 Additional work required by the building department over and above the original scope of work. * Add 4" metal bollard at pedestal locations 4' high, 2' in the ground. Filled with concrete and painted yellow. Top off with pvc cap. * Concrete pedestal base for the additional wind load requirements as per the engineering. * Provide PVC post buried in concrete to mount EVC sign. * Convert parking stalls to Handicap Stalls with access isles. Paint, stripe, signage, remove wheel stops. NOTE: Does not include any concrete or paving access paths to EV charger pedestals (if required).