Supply and install revised engineering for Bay 3 mechanical revisions due to new tenant occupancy requirements. New drawings to comply with new building plans submitted by others. New calculations based on the new occupancy load of 18 persons in a 4,500 sq. ft. space as per the new architectural drawings. Includes revised drawings, calculations, and schedules required by the building department.