Company will come out and install new Novo combo unit to address both the hardness and chlorine in the system. Company will also install a new pressure regulating valve to ensure the pressure is within specs for the new unit. Comes with two parts and labor warranty, and 10 year manufacture warranty Upon arrival turn main water off at ball valve in basement, drained out line and installed new PRV and boiler drain above it. Next cut into main water line and installed new Novo Combo Unit with new ball valves on inlet and outlet side, then routed water lines back into main water supply. Tested for leaks by turning main water back in setting pressure at boiler valve and then running water through all fixtures. All good no leaks present and all fixtures are working properly. At Regen cycle for this evening at 2 am.