Customer had mainline stoppage, this is the second time in a short amount of time that the mainline has stopped up. Snaked the main line 90 feet, hitting blockage at around 85 feet. Removed snake and the stoppage returned. Snaked the line again. Line is now open and flowing. Installed spanner flange on the left side of the flange. Set up camera for Wednesday 2/27/19.