MY PLUMBER HEATING COOLING & ELECTRICAL
MANASSAS, VA 20109
800-280-2820

Job Locations
for herndon, va


Map of Herndon VA
WAYNE F.

WAYNE F.


Job Checkin

Pulled and rehung mens urinal on main level 2nd from left with new seal. Cleaned old caulk and applied new white caulk. 30 day warranty Replaced failed vacuum breaker for same urinal. 30 day warranty Rebuilt Sloan valves for 2nd and 3rd stalls for ladies room toilets on main level. Also rebuilt stop valve for 3rd stall toilet. 30 day warranty. Warranties do not cover high pressure damage.