FURNISH LABOR AND MATERIAL FOR THE INSTALLATION OF A COMMERCIAL HOT WATER HEATER AS FOLLOWS: -CLOSE ISOLATION VALVE TO HOT WATER HEATER -DRAIN DOWN HOT WATER HEATER -DISCONNECT UTILITIES TO HEATER -REMOVAL AND DISPOSAL OF HEATER FROM PREMISES -INSTALL NEW AO SMITH BTH 199 100 GALLON COMMERCIAL HOT WATER HEATER -CONNECTIONS TO EXISTING HOT AND COLD WATER PIPING -CONNECTIONS TO EXISTING GAS AND ELECTRIC -CONNECTIONS TO EXISTING PVC VENT AND INTAKE PIPING -INSTALL NEW THERMAL EXPANSION TANK -REFILL SYSTEM WITH WATER -START UP AND TEST OPERATION -WORK TO BE DONE DURING NORMAL WORKING HOURS