CAME OUT FOR ESTIMATE ON EQUIPMENT. INSTALLED 4 TON HP/AH CONVERSION 7 YR P/L. MADE SURE EQUIPMENT WAS INSTALLED PROPERLY AND WORK AREA WAS CLEAN WHEN FINISH, CHECK BURNERS AND BURNER OPERATION. CHECK CONDENSER COIL. CHECK THERMOSTAT, AIR FILTER, AIRFLOW, AND ALL ELECTRICAL CONNECTIONS, EVERYTHING IS RUNNING GREAT,