INSTALLED 2 UV'S ERSA*2, SIAQ. MADE SURE EQUIPMENT WAS INSTALLED PROPERLY AND WORK AREA WAS CLEAN WHEN FINISH. CHECK THERMOSTAT, AIR FILTER, AIRFLOW, AND ALL ELECTRICAL CONNECTIONS. EVERYTHING IS FLOWING GOOD.