CAME OUT FOR ESTIMATE FOR EQUIPMENT. INSTALLED 2.5 TON FURN, TWO 110 VOLT MOTORS. 240 GAL WTR HTRS. EARNED SERVICE AGREEMENT. MADE SURE EQUIPMENT WAS INSTALLED CORRECTLY AND WORK AREA WAS LEFT CLEAN WHEN JOB WAS FINISHED. CHECK THERMOSTAT, AIRFLOW, AIR FILTER, HEAT EXCHANGER, HIGH LIMIT CONTROL, FAN CONTROL, AND ALL ELECTRICAL CONNECTIONS. CHECK MANIFOLD GAS PRESSURE AND FOR PROPER VENTING. EVERYTHING IS RUNNING GOOD.