T.O. EQU ESTIMATE FOR EQUIPMENT. INSTALLED 3.5 HP, 3.5 TON AH, PAD, BLUE EASY T-STAT COPPER LINE SET. LOW VOLT WIREH, HIGH VOLT WIRE. EQUIPMENT WAS INSTALLED CORRECTLY AND WORK AREA WAS LEFT CLEAN WHEN THE JOB WAS FINISHED. CHECK BURNERS AND BURNER OPERATION. CHECK MANIFOLD GAS PRESSURE AND FOR PROPER VENTING. CHECK AIRFLOW, AIR FILTER, THERMOSTAT, HEAT EXCHANGER, HIGH LIMIT CONTROL, FAN CONTROL, AND ALL ELECTRICAL CONNECTIONS. EVERYTHING IS RUNNING GOOD.