CAME OUT ON AN ESTIMATE FOR ADC. INSTALLED NEW AC W/ CONO PUMP. MADE SURE SYSTEM WAS INSTALLED PROPERLY. CHECK ALL ELECTRICAL CONNECTIONS, CHECK VOLTAGE AND AMPERAGE ON MOTORS, CHECK THERMOSTAT, CHECK DRAINAGE. CHECK THERMOSTAT. MADE SURE WORK AREA WAS CLEAN WHEN FINISHED. EVERYTHING IS RUNNING GREAT.