Went for a job continuation to replace a damaged pipe on ERV. Removed old damaged spiral duct and install new 6' flex duct. Stuffed insulation into wall cavity, where the 4" metal duct goes through the wall to the air hood outside to help prevent air sweating due to air temperature difference on the pipe.