Add 150’ of filled lines to existing filled lines and install cross overs to connect them. Installed 150 foot of field lines
Came out and gave customer multiple estimates and he is going to talk to his wife and let us know in the morning
run flex cable to get grease trap unstopped going towards sewer performance and safety testing draining in departure