Came out to diagnose problems
Inspect sewer Line and locate Locate where sewer runs outside Performance and safety testing
Sent estimate over for field line installation
losing high voltage in system search to find short restore power to unit performance and safety testing
disconnect old shower assembly install new kohler shower assembly performance and safety testing Come back Monday to do job Customer wants to know about membership
disconnect old shower assembly install new kohler shower assembly performance and safety testing Come back Monday to do job Customer wants to know about membership
replacing shower assembly
Arrived today for service on 2 systems. Upstairs is a 2013 2.5 ton American standard down stairs is a 2013 3.5 ton American standard. Cleaned outdoor coil. Checked Freon amps on motors. Cleaned drain lines and pump. Replaced 40+5 capacitor and contactor on outdoor unit for upstairs and 5 mfd capacitor for blower motor on upstairs. Systems are working properly at this time. Membership Replace 2= contactors 40+5 capacitor on outdoor unit for upstairs system and 5 mfd capacitor on blower motor for upstairs system.
Pumping 750 gallon septic tank
Arrived today for no cooling. Replaced 60+5 capacitor on outdoor unit. Explained to customer to leave system turned off until the morning to let compressor cool off then turn system back on. I can’t cool off compressor because there’s no faucet on the building to hook up for water hose to reset Thermo overload switch inside the compressor.
Estimate to unstop Both shower upstairs. Unstop both showers with sewer machine everything is draining great now
Break room sink was clogged Unlocked and reset garbage disposal Ran cable down branch line
Checked out pressure on house and checked to master sinks to make sure they are working properly
Cut out section of pipe with prv and check valve Install new prv and check valve with new connections Materials - 2487.61$ Labor 2 lead techs 4 hours - 1,320$ Trip charge x 2 - 319.09$ Total - 4,126.70