In Aubrey, TX installing a 5 Ton American Standard Variable Speed Heat Pump System.
At last a break in the weather to get this American Standard 15 ton RTU replaced.
Summer annual check up for medical city office building in Plano
Attending Diamond Dealer Day celebrating 35 years of Shearer Supply and American Standard Heating and Air Conditioning.
Repairs complete from car crashing through brick wall
Installing drainage in courtyard, Uptown Dallas
Replacing high pressure refrigerant switch on commercial rooftop unit
Preventative maintenance proposal for 50 ton AAON unit, Northpark Heart and Vascular.
Continuing to work on drain for apartment complex
Retaining wall and screen wall failure.
Checking commercial rooftop no cooling call, bad high pressure switch on heat pump.