3100 39th Ave North
St. Petersburg, FL 33714
727-822-7700

Job Locations
for belleair bluffs, fl


Map of Belleair Bluffs FL
Wade H.

Wade H.


Job Checkin

Removed 3 ton split system. Replaced with new 3 ton Amana split system. Sealed up supply Plenum with tape and mastic. Inside and outside. Hooked up copper piping, flushed out,leak test, and vacuum. New condensate pump. System is cooling and draining at this time . Need to return to change out air handler breaker. Was given 35 amp breaker for 240 V. Need 30 amp Eaton breaker for 208v