New return plenum up to trusses in garage, new thermostat, new supply plenum, new float switch, new hurricane pad outside with code approved anchors and brackets, reuse copper line set and flush and pressure test, reuse disconnect box, new anchors and brackets outside, all permits and inspections included. Install surge protection on outdoor system disconnect. Upon arriving at job, meet and greet with customer go over work for the day call Marcus and let him know that we need to run metal duck on this job order but I need to start tearing out condenser outside replace new pad new condenser tied down four corners rocks around the pad, Thai pad, down to existing concrete underneath new high-voltage, whip, new surge, protector, tear out air handler inside replace returns with rising return Plenum and then metal Snaplock everything is hung and sealed going into firewall back to return Plenum riser built new Plenum for supply all the way to metal ductwork going into firewall flush, copper