Office: Mr. McCoy will call in for payment. cap rArrived at the home and proceeded to find a way under the trailer. Needed to enter from the rear of the home. Removed old duct work from the equipment including the “T”. Replaced the flex runs from the home to the “T” and to the unit. Panduit strapped, mastic tapped and added mastic to seal duct work. Checked refrigerant charge and looks good. Send Luis back in 2 weeks to do a check on the system. 9/3/24: upon arrival met with the one owner and proceed to install new duct cover. Sealed all around the unit and up to the home. Began with check up of the equipment. Pressures were going up when adding a small amount of refrigerant. Sub cooling and super heat were off along with pressures rising. Removed the old refrigerant and checked the piston and found it clear of any debris. Replaced piston and began to pull a vacuum. Once it was completed, added refrigerant into the system and brought it to manufactures specifications of 5 lbs.