Upon arrival checked motors, electrical components, and pressures on 1 split attic York system and 1 split closet Bryant system. Cleared drain lines and added Nubrite. Replaced 2 Turbo Capacitors and added 2 TAP memberships on new home. Entered equipment information. Customer needs filter ordered for attic system. 2-line 500AB. 19 3/4. X 24 1/4 x 4 7/8 Customer needs UV bulb ordered and replaced which we don't carry (see pics).. Left systems in good operating condition.