Televised line for possible spot repair on shifted overhead sewer. will provide quote for installing a patch liiner.
10-31-2022: descaled about 30’ of 4” cast iron pipe from pipe opening under sink in break room to tee near overhead in basement, inversion lined 25’ of 4” cast starting liner after toilet/ vent stack connections ending liner just before tee near overhead in basement. 11-1-2022: descaled from 3 toilet collars, and epoxy coated (x3mil) from all 3 toilet collars up to cross connection into main run, also epoxy coated from pipe under sink end of inversion liner to tee in basement, and from start of inversion liner back to open pipe under sink (x3mil)