1762 S Dixie Hwy #2
Crete, IL 60417
708-758-5070

Our Top Cities


Local Reviews
for bolingbrook, il

Rated 5.0 out of 5 stars based on 2 customer reviews

Great Service!

Trenchless did a great job! I would definitely recommend their service when you don’t want to dig up and old pipe.


Response from Trenchless Innovations Inc.:

Thank you for sharing your experience with our team, Bill! We appreciate your business and are glad our team could solve your sewer problem without digging up your pipes! Thank you for choosing Trenchless Innovations. We hope you enjoy a sewer free of problems for years to come!

  • Overall Experience
  • Quality
  • Price
  • Convenience

Solved problem

I was glad I used Trenchless Innovations over others in the area as they were the only ones who offered cement casting of the metal ducting in my slab to increase its structural integrity and it turned out great.


Response from Trenchless Innovations Inc.:

Thank you for your kind words, Chuck! We are happy we could solve your air duct problem for you and we hope you're enjoying the cleaner and healthier air our process allows you! Thank you for choosing Trenchless Innovations. We are grateful for your business!

  • Overall Experience
  • Quality
  • Price
  • Convenience

Job Locations
for bolingbrook, il

Josh R.

Josh R. Job Checkin

8-13-25: Descaled 4” cast sewer line from new 4” PVC floor clean out in room#2 downstream 60’ to floor clean out in hallway near entrance door#3. Descaled 4” cast sewer from floor clean out near entrance door#3 downstream 60’ to floor clean out in library near room 100A. Descaled 4” cast sewer from floor clean out in library near room 100A downstream 40’ to floor clean out on other side of library near room 100D ***line has a belly in pipe that holds about 2” or half pipe of water from 15’-30’ downstream from clean out***. Descaled 6” cast sewer from 4” floor clean out in library near room 100D downstream 60’ to wye near entrance door#1, size change from 4”-6” cast just downstream of clean out ***hole in bottom of 6” cast about 20’ downstream of clean out***. Vacuumed out all loose scale from sewer line 220’(160’x4” and 60’x6”) from room#2 to wye near entrance door#1 and televised line was all clear. *** wipes and heavy brown paper towels in section of pipe with belly also wipes near


John R.

John R. Job Checkin

Televised sewer from multiple clean outs. Pipe is scaled up and causing paper and waste to hold in line. Suggest descaling and vacuuming the loose scale out. Will provide a quote for this work.


John R.

John R. Job Checkin

Section 3-South Building -Hydro- jetted and televised the main 8" pipe from the manhole near the gym entrance door approximately 300' upstream to the manhole inside the new auxiliary gym. -Flushed all loose scale and debris from the line. More than 40 gallons of scale and debris were removed. -Televised the branch line from the first girls toilet in room G-188 60' to 8". Main line was clear. Ties into 8" main 12' downstream at the cleanout in the girls PE office, room F165. -Televised form the boys and girls PE office bathroom toilets. Blockage at 45' from Boys PE office toilet. -Cut lead out with the Miller and robotic cutter, 8" downstream from the girls PE office toilet. -Televised 75' to the wye from the girls locker room. *All PE offices; girls and boys locker room bathrooms tie into the rise of the cleanout in F165. -Televised the branch line from the STEP bathroom 60' to 8". Main line was clear. Ties in the 8" main 60' downstream of the inside manhole near the auxiliary gy


John R.

John R. Job Checkin

Section 1-North Building Hydro jetted and televised: -From the 6" PVC, outside cleanout 150' to the floor cleanout in the rear staff bathrooms located in C-Wing. Flushed out all the loose scale and debris from the line. -From staff bathroom to main 1' downstream of the floor cleanout located just outside of room C62. -C-Wing ties in just downstream of the floor cleanout near room C66. -95' from the shorter cleanout sinks from room C65 ties in at 69'. -Room C62 ties in at 22'. -Room C61 ties in at 15'. Newer section of the school-pipe was in good condition. Section 2-North Building Hydro jetted and televised from: -Manhole near the main entrance 150' to the wye connection from D-Wing bathrooms. Flushed all loose scale and debris from the pipe. Televised: -Branch line from the first toilet in the girls room 75' to 6" main. Ties into the main 72' from the clean out in the nurses office. Line was clear. -Branch line from the staff lounge bathroom cleanout 75' to 6" main. Line was c


Josh R.

Josh R. Job Checkin

Pipe repair service call. Prepped for duct lining as well. 11-06-24 Excavated in laundry room to repair broken section of pipe. Repaired furnace box with hydraulic cement . Cleaned all underground ductwork and furnace box in preparation of first application of duct armor. 11-07-24 Applied first application of duct armor to all underground ductwork and furnace box in underground ductwork.


Bob S.

Bob S. Job Checkin

Televised ducts under slab floor. Ducts are concrete ducts with metal fittings. There is a collapse in the ducts under the kitchen sink and under the master b shower. Will provide proposal for spin cast mortaring and then spray lining if blockages are able to be removed.


Bob S.

Bob S. Job Checkin

Duct video inspection service call. Televised ducts under slab floor. Ducts are galvanized ducts and are very rusted. Ducts in 1st bedroom on right has several holes in the duct and should be dug and replaced. Will provide a proposal for that and also spin cast mortaring and spray lining the rest of the system.


Bob S.

Bob S. Job Checkin

Estimate for possible sewer lining


Bob S.

Bob S. Job Checkin

Televised ducts under slab floor. Ducts are concrete with metal fittings that are rusted and deteriorating. Suggest spin cast mortaring metal then spray lining ducts lining system with Duct Armor to encapsulate the concrete ducts.


Bob S.

Bob S. Job Checkin

Televised ducts under slab floor. Ducts are spiral wound metal ducts that are rusting and developing possible mold on the pvc coating. Suggest spin cast mortaring the ducts then spray lining with Duct Armor duct lining material.


John R.

John R. Job Checkin

1-2-24 Descaled approximately 50' of 4" cast iron pipe from a 4" floor cleanout located near the bathroom entrance downstream to just before connection to main line. Vacuumed loose scale out of the lines and got measurements for sewer lining tomorrow. 1-3-24 Inserted a 4” liner through the floor clean-out near the f wing extending approximately 50' downstream ending in the drop just before the connection to the main line. Reinstated 3 connections with robotic cutter.


John R.

John R. Job Checkin

Televised sewer line from pulled toilet in boys bathroom. Retrieved a grabber head and two coat hooks from sewer line.


John R.

John R. Job Checkin

Descaled approximately 90’ of 4” cast iron pipe from first cleanout in room 153 downstream to where the pipe connects to the main line going out of the building. Hydro jetted loose scale out of the line and vacuumed loose scale out of the line.


Josh R.

Josh R. Job Checkin

11/14/24 Applied second application of duct armor to all underground ductwork and furnace box.


Bob S.

Bob S. Job Checkin

Estimate